The end-user required additional storage capacity of wood pellet fuel used to fire a community boiler. The new system was to provide an extra storage buffer of the product when the supply of fuel to the site over the cold months became unreliable. The project scope was turnkey and included design, construction, and site installation of the silo and screw conveying system. Foundation design and build, electrical, and automation was also included.
Sep
02
Comments are closed.